#35 Multi-phase Recovery Istok / Istog · 20th century (1929)

Church of Sts Peter and Paul, Istok (Istog)

Church of Sts Peter and Paul, Istok (Istog) is entry #35 in the May 2009 archival catalogue of the Reconstruction Implementation Commission (RIC). According to the original technical site sheet, the site is described as: Free cross type domed church with pronaos and bell tower.Parish house and a few graves. The church was built in 1929.

Historical and Architectural Significance

According to the archived Reconstruction Implementation Commission (RIC) dossier #35, the site description reads: Free cross type domed church with pronaos and bell tower.Parish house and a few graves. The church was built in 1929. (Serbian counterpart: Crkva sa kupolom, tip slobodnog krsta sa pronaosom i zvonikom.Parohijski dom i nekoliko grobova. Crkva je sagrađena 1929. godine.). Within the RIC documentation, this summary served as the baseline architectural identification of the building structure, materials, and ancillary structures within the complex.

Covered by 2005 tender lot Ref. No. 14 (together with St John the Baptist in Peć #22) and by 2007 tender Ref. No. 43000-07-003-5-2-1 ('Reconstruction works at the Parish house and the Church of Saints Peter and Paul, Istog/Istok'). For 2008, the dossier records 'End of reconstruction works / Kraj radova na obnovi'.

Destruction and Recorded Damage (March 2004)

Under the heading 2004 — Damage Assessment in the original RIC dossier, the following condition was recorded: Major damage around southern window. Door and windows destroyed. Interior affected by fire, iconostasis burnt, altar destroyed, stone pavement partially destroyed. Parish house completely burnt down.

Damage assessments in the RIC dossiers derive from the three joint technical assessment missions conducted by the Council of Europe and the European Commission between May and July 2004, involving heritage protection specialists and representatives of the Serbian Orthodox Church.

Reconstruction and Conservation Works (2005–2009)

The table below presents the chronology of interventions from 2005 to 2009 according to the verified RIC archival dossier and tender registers:

Year-by-year reconstruction timeline — Church of Sts Peter and Paul, Istok (Istog)
Year Completed Works and Interventions Stage Status
2005Reconstruction of damaged stonework and external render Repair of internal plasters and cracks New doors, windows and grills Replacement of electrical installation Re-fixing of marble altar tableCompleted
2006No interventions carried out.Completed
2007Roof repairs. Reconstruction of the parish house. Archaeological assessment.Completed
2008End of reconstruction worksCompleted

Analysis of archival dossier #35 shows the year-by-year progression of works under the mandate of the Reconstruction Implementation Commission. Works carried out in 2005 formed part of Phase I emergency protective interventions (consolidation, roofing, securing openings, clearance, and perimeter fencing) implemented across 30 sites.

When reading the 2009 entry, note that the English original explicitly states 2009 — Further Interventions Programmed, whereas the Serbian heading uses the shorter label 2009 — Dalje intervencije. Listing an activity under 2009 therefore documents a programmed plan as of May 2009, not confirmation of subsequent execution.

Conservation Context and Monument Condition

According to the Commission's May 2009 documentation,

Frequently Asked Questions

How is site #35 titled in the original RIC catalogue?

In the English catalogue it is listed as '35 CHURCH OF STS. PETER AND PAUL Istog/Istok', and in the Serbian catalogue as '35 CRKVA SV. PETRA I PAVLA u Istoku'.

What damage was documented in the 2004 assessment?

According to the original RIC dossier: Major damage around southern window. Door and windows destroyed. Interior affected by fire, iconostasis burnt, altar destroyed, stone pavement partially destroyed. Parish house completely burnt down.

What protective works were recorded in 2005?

For 2005, the dossier records: Reconstruction of damaged stonework and external render Repair of internal plasters and cracks New doors, windows and grills Replacement of electrical installation Re-fixing of marble altar table.

What is the chronological cut-off of the data in this dossier?

Primary phase data is bounded by the May and July 2009 archival snapshots of the RIC website. Items listed under 2009 denote 'Further Interventions Programmed' at that date, not proof of subsequent completion.

Sources and Further Reading

  • Report Submitted by UNMIK Pursuant to Article 2.2 of the Agreement Between UNMIK and the Council of Europe Related to the Framework Convention for the Protection of National Minorities (ACFC/SR/II(2009)002) — Council of Europe / UNMIK (31. maj 2010.) · Source document ↗
  • RIC Archival Page: The Background / Uvod — Reconstruction Implementation Commission (RIC) — archival snapshot (17. maj 2009.)
  • RIC Archival Site Dossiers (/inc/{eng,srp}/sites/*.html, May–July 2009) — Reconstruction Implementation Commission (RIC) — archival snapshots (17. maj 2009. / 28. jul 2009.)
  • RIC Archival Page: RIC Mechanism / KSO mehanizam — Reconstruction Implementation Commission (RIC) — archival snapshot (16. maj 2009.)
  • RIC Archival Tender Lists 2005–2009 (/inc/{eng,srp}/–, May 2009) — Reconstruction Implementation Commission (RIC) — archival snapshots (16. maj 2009.)