#22 Multi-phase Recovery Peć / Peja / Pejë · 20th century (completed 1982)

Church of St John the Baptist, Peć (Peja)

Church of St John the Baptist, Peć (Peja) is entry #22 in the May 2009 archival catalogue of the Reconstruction Implementation Commission (RIC). According to the original technical site sheet, the site is described as: Free cross type with pronaos, bell tower over the pronaos.It was completed in 1982.

Historical and Architectural Significance

According to the archived Reconstruction Implementation Commission (RIC) dossier #22, the site description reads: Free cross type with pronaos, bell tower over the pronaos.It was completed in 1982. (Serbian counterpart: Tip slobodnog krsta sa pronaosom, zvonik na pronaosu.Završena je 1982.). Within the RIC documentation, this summary served as the baseline architectural identification of the building structure, materials, and ancillary structures within the complex.

Covered by 2005 tender lot Ref. No. 14 (together with Sts Peter and Paul in Istok #35), and by 2007 tender Ref. No. 43000-07-009-5-2-1 ('Reconstruction works at the Church of Saint John the Baptist in Peje/Pec'). The historical filename contains an uppercase 'J' (''), strictly preserved.

Destruction and Recorded Damage (March 2004)

Under the heading 2004 — Damage Assessment in the original RIC dossier, the following condition was recorded: Church looted and affected by fire and soot, doors and windows destroyed, marble pavement affected by explosion. Parish house burnt down..

Damage assessments in the RIC dossiers derive from the three joint technical assessment missions conducted by the Council of Europe and the European Commission between May and July 2004, involving heritage protection specialists and representatives of the Serbian Orthodox Church.

Reconstruction and Conservation Works (2005–2009)

The table below presents the chronology of interventions from 2005 to 2009 according to the verified RIC archival dossier and tender registers:

Year-by-year reconstruction timeline — Church of St John the Baptist, Peć (Peja)
Year Completed Works and Interventions Stage Status
2005Repair of the roof and new covering with aluminum sheet. New metallic entrance gates, timber doors, glazing of the windows. Repairs to damaged marble floor.Completed
2006No interventions carried out.Completed
2007Reconstruction of the parish house.Completed
2008Continuation of works from 2007.Completed
2009Internal repairs. Iconostasis.Planned

Analysis of archival dossier #22 shows the year-by-year progression of works under the mandate of the Reconstruction Implementation Commission. Works carried out in 2005 formed part of Phase I emergency protective interventions (consolidation, roofing, securing openings, clearance, and perimeter fencing) implemented across 30 sites.

When reading the 2009 entry, note that the English original explicitly states 2009 — Further Interventions Programmed, whereas the Serbian heading uses the shorter label 2009 — Dalje intervencije. Listing an activity under 2009 therefore documents a programmed plan as of May 2009, not confirmation of subsequent execution.

Conservation Context and Monument Condition

According to the Commission's May 2009 documentation,

Frequently Asked Questions

How is site #22 titled in the original RIC catalogue?

In the English catalogue it is listed as '22 CHURCH OF ST. JOHN THE BAPTIST Pejë/Pec', and in the Serbian catalogue as '22 CRKVA SV. JOVANA PRETEČE u Peči'.

What damage was documented in the 2004 assessment?

According to the original RIC dossier: Church looted and affected by fire and soot, doors and windows destroyed, marble pavement affected by explosion. Parish house burnt down..

What protective works were recorded in 2005?

For 2005, the dossier records: Repair of the roof and new covering with aluminum sheet. New metallic entrance gates, timber doors, glazing of the windows. Repairs to damaged marble floor..

What is the chronological cut-off of the data in this dossier?

Primary phase data is bounded by the May and July 2009 archival snapshots of the RIC website. Items listed under 2009 denote 'Further Interventions Programmed' at that date, not proof of subsequent completion.

Sources and Further Reading

  • Report Submitted by UNMIK Pursuant to Article 2.2 of the Agreement Between UNMIK and the Council of Europe Related to the Framework Convention for the Protection of National Minorities (ACFC/SR/II(2009)002) — Council of Europe / UNMIK (31. maj 2010.) · Source document ↗
  • RIC Archival Page: The Background / Uvod — Reconstruction Implementation Commission (RIC) — archival snapshot (17. maj 2009.)
  • RIC Archival Site Dossiers (/inc/{eng,srp}/sites/*.html, May–July 2009) — Reconstruction Implementation Commission (RIC) — archival snapshots (17. maj 2009. / 28. jul 2009.)
  • RIC Archival Page: RIC Mechanism / KSO mehanizam — Reconstruction Implementation Commission (RIC) — archival snapshot (16. maj 2009.)
  • RIC Archival Tender Lists 2005–2009 (/inc/{eng,srp}/–, May 2009) — Reconstruction Implementation Commission (RIC) — archival snapshots (16. maj 2009.)